THE IDEA OF THIS THREAD IS TO ALLOW FARMERS TO SEE IF WE ARE CURRENTLY COVERING THEIR AREA
From just 1 load to as many as you require, we can deliver road planings to your land, directly off the elevator belt from the road planer. All we require is that we have reasonable access for 8 wheeler tippers, the tipping area is on hard level ground, and there are no overhead cables.
The drivers will have a map with your postcode included on it, and will ring you just as soon as they are loaded on site, just to give you a bit of notice that they are on their way.
Please Remember we are under pressure to ensure low turn around times for our wagons and have a MAXIMUM turn around time of 1 hour 10 minutes from our job on the road.
CURRENT HIGHWAY MAINTENANCE JOBS
Junction 17-18 of the M4 (IN BETWEEN BRISTOL AND SWINDON)
Junction 11-12 of the M3 (IN BETWEEN SOUTHAMPTON AND WINCHESTER)
A404M (NEAR MAIDENHEAD, MARLOW SLOUGH)
UPCOMING JOBS
Junction 10-10 of the M4 (NEAR READING)
A3 (NEAR GUILDFORD)
A3 (NEAR PETERSFIELD & WATERLOOVILLE)
3 BIG JOBS IN EXETER
Junction 15-16 of the M4 (IN BETWEEN BRISTOL AND SWINDON)
Junction 8-9 of the M3 (IN BETWEEN WINCHESTER AND BASINGSTOKE)
You can get in touch with us by...
-------------------------------------------------------------------------------
Website:
http://roadplaningsupplies.co.uk/
-------------------------------------------------------------------------------
Phone:
Office - 01626 439 132
Matt - 07718497274
-------------------------------------------------------------------------------
Email:
[email protected]
-------------------------------------------------------------------------------
Post:
32 Lyndale Rd
Kingsteignton
Newton Abbot
Devon
TQ12 3J
------------------------------------------------------------------------------
Matthew Jerwood
Sales & Logistics Coordinator
Road Planing Supplies Ltd
Tel: 01626 439132
Mob: 0771 8497275
www.roadplaningsupplies.co.uk