Had a long email from a surveyor on utility checks. Overhead 3 line setup, 11 kva I think.
They want to cut about half a km of hedge that to be fair is in places getting close to the line.
How do I stand with the RPA? If they cut it in may when it dries out will we get any grief?
They want to cut about half a km of hedge that to be fair is in places getting close to the line.
How do I stand with the RPA? If they cut it in may when it dries out will we get any grief?