I’m putting a 6 inch concrete floor in a new shed. Was wondering ideally how long do I need to leave the floor after pouring before I can use it?
It’s going to be used to store both straw and grain.
Concrete will be 35N 20 with steel fibres.

Thanks
 
Hi
I’m putting a 6 inch concrete floor in a new shed. Was wondering ideally how long do I need to leave the floor after pouring before I can use it?
It’s going to be used to store both straw and grain.
Concrete will be 35N 20 with steel fibres.

Thanks

I think you’d want 6 weeks minimum before any heavy machinery was used
 

A1an

Member
I was once told 5 days for every inch if you want to take vehicles on it.

It’s never done me wrong so I stuck to it.
 

Grouse

Member
We have just done one with a 10” thick RC45 floor, fibres and steel mesh. Left it 28 days prior to loading and all is fine.
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 105 40.7%
  • Up to 25%

    Votes: 94 36.4%
  • 25-50%

    Votes: 39 15.1%
  • 50-75%

    Votes: 5 1.9%
  • 75-100%

    Votes: 3 1.2%
  • 100% I’ve had enough of farming!

    Votes: 12 4.7%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 1,705
  • 32
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ

The Farming Forum has teamed up with the award winning hardware manufacturer Easy Compute to bring you an educational talk about how AI and blockchain technology is helping farmers to diversify their land.

Over the past 7 years, Easy Compute have been working with farmers, agricultural businesses, and renewable energy farms all across the UK to help turn leftover space into mini data centres. With...
Top