kevindb880
Member
- Location
- Herts
We are going to put a some 4in perforated pipes leading to a ditch from a wet spot.
What is the correct depth for the pipe + stone on top bearing in mind it may well be moled in the future?
The ground lies down hill to the ditch, we were going to put the pipes at an angle so not directly down the hill, any suggestions on how far apart the pipes should be?
Cheers
What is the correct depth for the pipe + stone on top bearing in mind it may well be moled in the future?
The ground lies down hill to the ditch, we were going to put the pipes at an angle so not directly down the hill, any suggestions on how far apart the pipes should be?
Cheers