Looking to make a 400m track over a private field to access an outbuilding. Access will be by 4x4s, cars, and the occasional tractor.
Ideally I would like to do this once and not have to be filling in potholes every year. However given the length is 400m+ trying to be conservative with the costs and perhaps build 2 wheel tracks rather then excavating a full road.
I looked at this post (https://thefarmingforum.co.uk/index.php?threads/making-access-road-depth-of-base.108854/) and obtained some guidance but I just want to check if I've understood.
Option 1
Would this be a good track construction? If not what is missing/wrong?
Option 2
If I placed the dugout soil to the side of the tracks like so and maybe planted some foliage/shrubs in them would that be a good or bad thing in terms of draining?
Any advice would be greatly appreciated.
Ideally I would like to do this once and not have to be filling in potholes every year. However given the length is 400m+ trying to be conservative with the costs and perhaps build 2 wheel tracks rather then excavating a full road.
I looked at this post (https://thefarmingforum.co.uk/index.php?threads/making-access-road-depth-of-base.108854/) and obtained some guidance but I just want to check if I've understood.
Option 1
Would this be a good track construction? If not what is missing/wrong?
Option 2
If I placed the dugout soil to the side of the tracks like so and maybe planted some foliage/shrubs in them would that be a good or bad thing in terms of draining?
Any advice would be greatly appreciated.
Last edited: