New Electricity Connection - alternative contractors?

chaffcutter

Moderator
Arable Farmer
Location
S. Staffs
Just had a quote from Western Power to connect a new shed to the transformer on our land 100m away and there is an option to get an alternative quote, has anyone in their supply area used a different contractor at all? Google seems a bit shy on suppliers unless you are connecting a housing estate or a factory!
 

Steevo

Member
Location
Gloucestershire
This might be a good start.....

 

chaffcutter

Moderator
Arable Farmer
Location
S. Staffs
Yes already looked at some of those, most are very large companies out of our area, I am hoping to find someone more user friendly locally and recommended.
 

Steevo

Member
Location
Gloucestershire
I came across it via here:


It makes a welcome change for them to make it easy. I went through similar with Severn Trent recently and found it a nightmare.

Will likely have to do similar again before long.
 

vantage

Member
Livestock Farmer
Location
Pembs
When I enquired with a couple of companies doing this they told me to stay with Western Power as the connection was not big enough or complex enough for them to bother with!
 

chaffcutter

Moderator
Arable Farmer
Location
S. Staffs
I had a feeling that might be so. It is the service termination board and so on that is so expensive rather than the cabling etc. Was wondering if our electrician can do that rather than WP, anyone know?
 

Badshot

Member
Location
Kent
You should be able to trench it and lay the cable, maybe fit the head, might have to leave it open for them to inspect.
Just leaving them to connect it all up.


I definitely dug the trench out on mine.
Left them the rest.
 

Forever Fendt

Member
Location
Derbyshire
Just had a quote from Western Power to connect a new shed to the transformer on our land 100m away and there is an option to get an alternative quote, has anyone in their supply area used a different contractor at all? Google seems a bit shy on suppliers unless you are connecting a housing estate or a factory!
It’s almost a fiddle the companies who can quote for the contestable work know the cost of the work from WPD and quote accordingly never had any worthwhile savings to bother
 

br jones

Member
You should be able to trench it and lay the cable, maybe fit the head, might have to leave it open for them to inspect.
Just leaving them to connect it all up.


I definitely dug the trench out on mine.
Left them the rest.
No ,western power will not let you lay the cable as its theirs ,,digg and reinstate ,is about all you can do for them
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 79 42.5%
  • Up to 25%

    Votes: 65 34.9%
  • 25-50%

    Votes: 30 16.1%
  • 50-75%

    Votes: 3 1.6%
  • 75-100%

    Votes: 3 1.6%
  • 100% I’ve had enough of farming!

    Votes: 6 3.2%

Red Tractor drops launch of green farming scheme amid anger from farmers

  • 1,287
  • 1
As reported in Independent


quote: “Red Tractor has confirmed it is dropping plans to launch its green farming assurance standard in April“

read the TFF thread here: https://thefarmingforum.co.uk/index.php?threads/gfc-was-to-go-ahead-now-not-going-ahead.405234/