hi all.
As above am doing some home work on a Stiring Air drying Store, to 14' depth of grain.
I looked at a very good example yesterday. With a Concrete BB floor.
I guess I am trying to learn from other people's experiences both good or bad.
What I learned yesterday was that there is a lot more sideways pressure on the walls with Stirers. That 20cm wall panels are required & the tunnel needs to be up to the job.
Thinking 8.8 M eves height.
Costing a lot of money needs to be up to the job for 50 yr's. Min.
Thanks in advance.
As above am doing some home work on a Stiring Air drying Store, to 14' depth of grain.
I looked at a very good example yesterday. With a Concrete BB floor.
I guess I am trying to learn from other people's experiences both good or bad.
What I learned yesterday was that there is a lot more sideways pressure on the walls with Stirers. That 20cm wall panels are required & the tunnel needs to be up to the job.
Thinking 8.8 M eves height.
Costing a lot of money needs to be up to the job for 50 yr's. Min.
Thanks in advance.