Screeding or something else?

Andrew K

Member
Arable Farmer
Location
Essex
Have a relatively old but serviceable building with a cracked, slightly unlevel concrete floor.
The shed has B1/B8 industrial permission and i would like to tidy up the floor to withstand light industrial use for a good few years.
The floor does not justify digging up and reconcreting, but would prefer to screed or something else?
The budget is up to 5k ideally on a 5000 sq ft unit. As the unit is currently vacant I have a clear site to work with.

What would you do with it?
 

Will you help clear snow?

  • yes

    Votes: 68 31.6%
  • no

    Votes: 147 68.4%

The London Palladium event “BPR Seminar”

  • 12,743
  • 186
This is our next step following the London rally 🚜

BPR is not just a farming issue, it affects ALL business, it removes incentive to invest for growth

Join us @LondonPalladium on the 16th for beginning of UK business fight back👍

Back
Top