What have I missed ??
Been off grid since 11 am Friday, only got power,phone and mobile couple hours ago . Poor little 2 kv generator has been on continuous keeping our fish tanks and reptile pens warm ( farm school). Had to refuel every 3 hours and can report that it used 20 ltrs petrol every 24 hrs !
Boy was it windy and has been since and even now its windy. No major damage just 50 or so tiles/ slates.
Big thankyou to Western Power as they were faced with hundreds of problems around here and even though it took three and half days to restore , I know they did well .
 
"The main road connecting Manchester and Sheffield could be closed for months after recent storms caused a number of landslides.

“The road is in serious jeopardy,” he told i. “It’s the ground that supports the road [that’s sinking], there’s about a 75ft drop into the river, and if that ground slips into the river, the road could follow it.”

Mr Byford, a former building control officer, says the road is still “moving” and that no proper assessment will be able to take place until it stops."

If they are not going to make an assessment until the ground has settled (stopped moving) then the road will be closed for a long time and the Woodhead Pass and M62 routes will be even worse than normal, particularly since the Northern Rail Leeds Manchester Rail route will be replaced with busses along the M62 during the next 15 years of upgrades.


In 2015, Highways England proposed a £6billion tunnel beneath the Pennines but the project has yet to be signed off.
 

Steevo

Member
Location
Gloucestershire
"The main road connecting Manchester and Sheffield could be closed for months after recent storms caused a number of landslides.

“The road is in serious jeopardy,” he told i. “It’s the ground that supports the road [that’s sinking], there’s about a 75ft drop into the river, and if that ground slips into the river, the road could follow it.”

Mr Byford, a former building control officer, says the road is still “moving” and that no proper assessment will be able to take place until it stops."

If they are not going to make an assessment until the ground has settled (stopped moving) then the road will be closed for a long time and the Woodhead Pass and M62 routes will be even worse than normal, particularly since the Northern Rail Leeds Manchester Rail route will be replaced with busses along the M62 during the next 15 years of upgrades.


In 2015, Highways England proposed a £6billion tunnel beneath the Pennines but the project has yet to be signed off.

A "replacement bus service" for FIFTEEN YEARS?!!! o_O
 
A "replacement bus service" for FIFTEEN YEARS?!!! o_O
That’s what “The North” has been allocated instead of a new Electric Leeds - Manchester line,
The upgrading to Electric will be along the existing route, section by section similar to how the farce which was the West Coast mainline upgrade, and Bradford will STILL be a terminus and not on a through main line.
That’s what “levelling up” means for the laughingly called “Northern Powerhouse”.
 

Steevo

Member
Location
Gloucestershire
That’s what “The North” has been allocated instead of a new Electric Leeds - Manchester line,
The upgrading to Electric will be along the existing route, section by section similar to how the farce which was the West Coast mainline upgrade, and Bradford will STILL be a terminus and not on a through main line.
That’s what “levelling up” means for the laughingly called “Northern Powerhouse”.

Likely soon to be renamed the Northern Poorhouse".
 

icanshootwell

Member
Location
Ross-on-wye
Follow up to the damage we had, the roof was unsafe so it had to come off.
 

Attachments

  • IMG_20220302_141049_3.jpg
    IMG_20220302_141049_3.jpg
    242.9 KB · Views: 0
  • IMG_20220302_160755_4.jpg
    IMG_20220302_160755_4.jpg
    194.7 KB · Views: 0

Spear

Member
Livestock Farmer
Location
North Devon
Still waiting for BT to fix phone and broadband here. Only been 2 weeks 🤔.
Everytime I actually get through to speak to someone they inform me engineer will be with me tomorrow. Ah well 4th time lucky maybe? Glad I had StarLink delivered just days later.
 

icanshootwell

Member
Location
Ross-on-wye
Still waiting for BT to fix phone and broadband here. Only been 2 weeks 🤔.
Everytime I actually get through to speak to someone they inform me engineer will be with me tomorrow. Ah well 4th time lucky maybe? Glad I had StarLink delivered just days later.
Don,t have BT phone line anymore, there internet speed was shi#e, plus everyone's on mobile phones now. We have mobile internet now, even comes on holiday with us, even though i haven't been there anywhere for 3 years except Bluestone.
 
Still waiting for BT to fix phone and broadband here. Only been 2 weeks 🤔.
Everytime I actually get through to speak to someone they inform me engineer will be with me tomorrow. Ah well 4th time lucky maybe? Glad I had StarLink delivered just days later.
My line went down on the Friday and was finally repaired last Monday so over 10 days. They told me not to worry as my broadband would automatically connect to 4G but that was hopeless and no amount of experimenting would find me a good signal.
 

Spear

Member
Livestock Farmer
Location
North Devon
My line went down on the Friday and was finally repaired last Monday so over 10 days. They told me not to worry as my broadband would automatically connect to 4G but that was hopeless and no amount of experimenting would find me a good signal.
Yeah. No 4G on their network here. It’s not even the fact they’ve not fixed it yet it’s the lack of communication

contract runs out on the 14th so was planning on getting rid of line then anyway, not sure how that will affect the compensation payment.
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 105 40.5%
  • Up to 25%

    Votes: 94 36.3%
  • 25-50%

    Votes: 39 15.1%
  • 50-75%

    Votes: 5 1.9%
  • 75-100%

    Votes: 3 1.2%
  • 100% I’ve had enough of farming!

    Votes: 13 5.0%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 1,809
  • 32
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ

The Farming Forum has teamed up with the award winning hardware manufacturer Easy Compute to bring you an educational talk about how AI and blockchain technology is helping farmers to diversify their land.

Over the past 7 years, Easy Compute have been working with farmers, agricultural businesses, and renewable energy farms all across the UK to help turn leftover space into mini data centres. With...
Top