I have 3x 15kw turbines, producing around 90000kw intotal per year. Feed in tarriff runs for another 8 years and i think there is maybe a way i can replace them or add another to max out my feed in tarriff payment. Is this a thing? So 45 (kw site) x 24 (hours in the day) x 366 (days in year) = 394200kw.
Are we able to up production from 90000kw to 394200kw and get pay for it all?
At 39p fit it soon adds up, never mind export.
If this is possible. Has anyone done it? How large a turbine would we need? How much would it all cost from start to finish?
I have asked scottish power for a 500kw grid connection but there painfully slow in getting back to me.
Are we able to up production from 90000kw to 394200kw and get pay for it all?
At 39p fit it soon adds up, never mind export.
If this is possible. Has anyone done it? How large a turbine would we need? How much would it all cost from start to finish?
I have asked scottish power for a 500kw grid connection but there painfully slow in getting back to me.