Would never go through it again. Repair costs are horrendous. Planning is painful as but the electric is very beneficial if you have a use.Hi All
For the ones who have actually installed a Wind Turbine on their land - could you please share experiances of costs / planning issues etc, and more importantly is it something you would do again as it is actually beneficial?
Would never go through it again. Repair costs are horrendous. Planning is painful as but the electric is very beneficial if you have a use.
Endurance E3120 55kw. It's just 5 year old and currently due for work that's around 25% of purchase cost. It was also over sold on wind available at my site as only ever has done around 75% of original estimate for my site. Have seen both the installer and the manufacturer go bankrupt and ending my 5 year warranty very abruptly.May I ask what size unit you opted for?
Endurance E3120 55kw. It's just 5 year old and currently due for work that's around 25% of purchase cost. It was also over sold on wind available at my site as only ever has done around 75% of original estimate for my site. Have seen both the installer and the manufacturer go bankrupt and ending my 5 year warranty very abruptly.
Endurance E3120 55kw. It's just 5 year old and currently due for work that's around 25% of purchase cost. It was also over sold on wind available at my site as only ever has done around 75% of original estimate for my site. Have seen both the installer and the manufacturer go bankrupt and ending my 5 year warranty very abruptly.
Can you explain a bit more?If I was doing a wind turbine now it would be hydraulic with storage giving 24/7 power.
Can you explain a bit more?
Is it a bit like a hydro dam pumping up during low demand
BumpAnybody got a Gaia 133., curious about reliability.
Vestas 200kw, done our own planning, sourced turbine ourselves, projected managed in house, DNO connections FIT application etc etc. Frustrating at times but we managed it.
Erected by a local world class company on our doorstep (Windhoist- plug!)
One of the best decisions in our farming career. Payback- 20months.
.
Impressive return.Vestas 200kw, done our own planning, sourced turbine ourselves, projected managed in house, DNO connections FIT application etc etc. Frustrating at times but we managed it.
Erected by a local world class company on our doorstep (Windhoist- plug!)
One of the best decisions in our farming career. Payback- 20months.
.
Is this a vesta that has been modified to hydraulic. If I could get planning permission I would be doing this but no chance with my local authority. Largest turbine they have passed is 50kw which I dont believe is an economic size. Would rather have 3 x 250kw to stand a chance of getting through planning.Small generator at low wind speed,higher wind speed switch over to large generator.This is current production this minute....we have seen 92mph wind speed recorded at 30m one January...Full Brake obviously !