Hi Guys
I've been having a terrible run of G59 /2 Applications with the last 6 all getting returned with deal breaking upgrade costs.
However I made 2 Applications for farms in Lincolnshire (50 kWp) at 11:00 am this morning with Western Power Distribution and received a phone call just after 1:00 pm telling me I could go ahead with both - I'm totally gob smacked.
Cheers
Mike Smith
I've been having a terrible run of G59 /2 Applications with the last 6 all getting returned with deal breaking upgrade costs.
However I made 2 Applications for farms in Lincolnshire (50 kWp) at 11:00 am this morning with Western Power Distribution and received a phone call just after 1:00 pm telling me I could go ahead with both - I'm totally gob smacked.
Cheers
Mike Smith