      555 replied to the thread Biomass Boiler Required.
      What size, Kw are you looking for?
    • 5
      555 replied to the thread RHI System Heat Meters ..
      As far as I am aware the presence of glycol affects , slightly , the recorded kw / mw. Not sure if its more or less. To combat this the...
    • 5
      555 replied to the thread RHI System Heat Meters ..
      Sontex meters can take glycol - You just need to have them calibrated to show glycol levels. As far as I sontex are the only ones that...
    • 5
      555 replied to the thread `Heat meter mounting location.
      Its down to the brand of meter you are installing, it will be a length of pipe that's a multiple of the diameter of the flow meter. All...
    • 5
      555 replied to the thread Biomass boiler efficiency.
      On straw , makes it viable at Tier 2. I would say the biggest heat load is the industrial units. Are they insulated by any chance? Once...
    • 5
      555 replied to the thread Biomass boiler efficiency.
      If you are buying your chip in at around 4p a kw against an RHI income of say 3p a kw.Tier 2 So unless you really need the heat it’s...
    • 5
      555 replied to the thread BSL/WOODSURE.
      What type of boiler is it? You may be able to find the Emissions Cert on google?
    • 5
      555 replied to the thread Biomass boiler efficiency.
      About 2740T - £300,000 with RHI income of £272,000 (6p/2.6p) so your heating cost is £28,0000 or 1/3p per KW - exceptional value ...
    • 5
      555 replied to the thread Biomass boiler efficiency.
      To hit the theoretical 8,760,000kw a year you will need 1000kw of demand every hour. What are you using the boiler for and what is the...
    • 5
      555 replied to the thread BSL/WOODSURE.
      You should have somewhere an OFGEM emissions certificate, it would have been part of your RHI application. This will state the fuel you...
      • 1701766789914.png
    • 5
      I agree, its all green washing. I believe a levy will be payable depending on your % use of "sustainable" fuel - How they create that...
    • 5
      We are working with a firm that converts Miscanthus into jet fuel! The Miscanthus gets hammered and then pelletised, to reduce...
    • 5
      555 replied to the thread G99 Forms -.
      Thanks, will try them both. I have made a good start, its the terminology that tricky.
    • 5
      555 replied to the thread G99 Forms -.
      It’s the paper work I need help with, we Manco, have the boilers and ORC’s. How’s your Linka performing?
    • 5
      555 replied to the thread G99 Forms -.
      5Mw Waste wood Boiler and 3ORC's generating 500kw electrical
  • Loading…
  • Loading…

The London Palladium event “BPR Seminar”

  • 9,021
  • 120
This is our next step following the London rally 🚜

BPR is not just a farming issue, it affects ALL business, it removes incentive to invest for growth

Join us @LondonPalladium on the 16th for beginning of UK business fight back👍