Would like to lay some concrete as a base for our new agricultural building and also in front. Total area is around 40 mtrs x 20 mtrs. Can anyone advice how to calculate the cost of Ready mix and depth required ?
Many thanks from a Newbie !!
 
I was upset when my guy over ordered by half a cube. I think he would of been buried under the extra 24 cube!
Indeed, but I don’t know how others work but I tend to give an indication of how much I want.................with better maths than this morning and when I get down to the last load have a quick calculation of how much is needed to finish off
Don’t know what went wrong earlier, probably pressed a wrong button on the calculator, guess it pays to take heed of the old adage, measure twice and cut once or more to the point, check your calculations
 
Screenshot_20200416-203918_Snapchat.jpg
 

Lawless

Member
Sorry for hijacking but can some one explain what strength concrete the following is C32/40 pump MCC320?
Is it a good strong spec?
 

Greenasgrass

Member
Location
N Ireland
Sorry for hijacking but can some one explain what strength concrete the following is C32/40 pump MCC320?
Is it a good strong spec?

40n @ 28 days with a minimum cement content of 320kg/m3.
I wouldn’t want to be breaking it out with a jack hammer after a month anyway [emoji23].
There is a lot more to specifying concrete than its 28 strength.
What is it for? Slabs or walls?
How soon do you need to traffic it?
If walls how soon do you want to strip Formwork?
Do you need early age strength?
All these things matter.
 

ScottL

Member
Livestock Farmer
Location
Farnham
Sorry for hijacking but can some one explain what strength concrete the following is C32/40 pump MCC320?
Is it a good strong spec?
40newton as determined by cube strength. The C32 part refers to cylinder strength which Americans tend to use. Should be plenty strong for most agri elements such as yards, pits etc
 

Lawless

Member
40n @ 28 days with a minimum cement content of 320kg/m3.
I wouldn’t want to be breaking it out with a jack hammer after a month anyway [emoji23].
There is a lot more to specifying concrete than its 28 strength.
What is it for? Slabs or walls?
How soon do you need to traffic it?
If walls how soon do you want to strip Formwork?
Do you need early age strength?
All these things matter.
It’s for an external yard - Mostly HGVs and Ag equipment.
 

Will you help clear snow?

  • yes

    Votes: 68 32.2%
  • no

    Votes: 143 67.8%

The London Palladium event “BPR Seminar”

  • 8,848
  • 120
This is our next step following the London rally 🚜

BPR is not just a farming issue, it affects ALL business, it removes incentive to invest for growth

Join us @LondonPalladium on the 16th for beginning of UK business fight back👍

Back
Top