As I have had a lot of interest and requests I've decided that if I can get the right price for it I will sell my 4m 750a and move to a new 6m
Its just been rebuilt to current 90 series spec. complete every nut and bolt and bush / pin rebuild of the coulters, all new bearings, new 90 series depth wheels and tyres, new discs, bearings, new Needham ag V8 firming wheels, 90 series coulters and seed tubes, bonnilla seed tabs and Wox Gutler closers - new coulter, firiming and gultler springs - nearly 10k was spent on this plus at least 100hrs in the workshop
Hopper extended and frame professionally gusseted for strength
4x new rear tyres
Its a Greenstar drill so full rate control, hopper alarms, area etc compatible with satrfire if you wish but with loom to work on any brand of tractor
A great drill in perfect condition, ready for many 10's of thousands of acres of work with all the right modifications to make these drills work very well
£35,000 - you can find cheaper 4m's to import etc but wear wise this is an as new drill to full new spec
As I have spring work to complete the drill would be available 12 weeks after doing a deal to allow time for replacement to get here
Its just been rebuilt to current 90 series spec. complete every nut and bolt and bush / pin rebuild of the coulters, all new bearings, new 90 series depth wheels and tyres, new discs, bearings, new Needham ag V8 firming wheels, 90 series coulters and seed tubes, bonnilla seed tabs and Wox Gutler closers - new coulter, firiming and gultler springs - nearly 10k was spent on this plus at least 100hrs in the workshop
Hopper extended and frame professionally gusseted for strength
4x new rear tyres
Its a Greenstar drill so full rate control, hopper alarms, area etc compatible with satrfire if you wish but with loom to work on any brand of tractor
A great drill in perfect condition, ready for many 10's of thousands of acres of work with all the right modifications to make these drills work very well
£35,000 - you can find cheaper 4m's to import etc but wear wise this is an as new drill to full new spec
As I have spring work to complete the drill would be available 12 weeks after doing a deal to allow time for replacement to get here