Recoil
Member
- Location
- South East Wales
Going to be making an access road into some fields. Will get the odd tractor or lorry using it but mainly just cars/4x4s. Planning to get a digger in to dig down for the base, lay teram on the soil and tip recycled stone/concrete on top of this and then eventually top with something a bit finer on the top to get a tidy finish. Question is what depth should the stone be? Ground is pretty dry but I can get the stone for a good price so don't mind putting it down thick as a precaution. Thanks.