dannewhouse
Member
- Location
- huddersfield
How's much. Would I be Looking at for a decent job tidying a Massey 6265 up.
It needs 2 rear mudguards and the nose cone which I have. Mudguards are 200-250 each metal or fibreglass.
It wants new front wheels as I keep cracking these rims, probably go solids.
Wants small amount of panel beating on bonnet side not noticeable if didn't get done.
4 bonnet parts 2 wings in red.
4 wheels in grey I will knock tyres off beeds
Possibly a splash of black on front axle, linkage and mudguard behind steps.
Should look smart then and be ready for another 7500 hours.
A 6616 is just too much money!
It needs 2 rear mudguards and the nose cone which I have. Mudguards are 200-250 each metal or fibreglass.
It wants new front wheels as I keep cracking these rims, probably go solids.
Wants small amount of panel beating on bonnet side not noticeable if didn't get done.
4 bonnet parts 2 wings in red.
4 wheels in grey I will knock tyres off beeds
Possibly a splash of black on front axle, linkage and mudguard behind steps.
Should look smart then and be ready for another 7500 hours.
A 6616 is just too much money!