Mixedupfarmer
Member
- Location
- Norfolk
The £220/ha bit is not right though is it? The BPS was only part of the budget, in the past many farms ran HLS/ELS/Mid tier on top of BPS, out of the same pot. These schemes / claims are slowly ending and getting put into ELMSDefra only has £220 hectare to play with.some of the boys in these threads with AHL2 planted July followed by AHL1 plus a bit of IPM4 and a dash of SAM2 with a smidge of IPM3 will be drawing more than that per hectare. Relying on the man growing parsnips not getting ought. Now that fella expects another £78 hectare. Oh and the variable rate fert payment, so another £29 or so. And you think the budget won't be spent. In meantime upland grass boys only way is destock. Just find it fascinating. Hey ho.