I'm planning to run an electricity cable underground to some farm buildings approx 500 metres away.
Electrician is recommending I use a 3 phase 60 amp cable about the width of my arm.
I plan to use electricity for lights, pressure washer and general farm equipment.
If I were to invest in solar, small wind or possibly battery power in the future would the cable be big enough or should I run something else while the trench is dug?
Just wanted to safeguard my future options.
Cheers in advance
 

kill

Member
Livestock Farmer
Location
South West
I have an 50kw Endurance Wind Turbine and the cable for it at 150 metres cost 7k so don't get carried away as it will sting you where it hurts.
 
Planned to dig the trench myself, and hoping to get a little grant aid.
Seemingly I have to go larger to allow for the distance of travel. It's 450 metres to be precise.
Thought I should possibly run an Ethernet cable or something?
I'm hoping wind companies have been overcharging poor farmers.. anyway, just trying to get a few quotes or some advice. Cheers, already looks expensive!
 

tomg

Member
Location
York
When my house was built the plan was to take a feed from the farm buildings which was about 100 or so meters, the electrician said the size of cable needed to use was to big for his tools and the quote for the cable was over £1k. He suggested ringing northern power grid for a quote, electric underground main was 70m away. We dug the trench and supplied the ducting and the cable they put in didn't look that big. It cost £1k.
 
Planned to dig the trench myself, and hoping to get a little grant aid.
Seemingly I have to go larger to allow for the distance of travel. It's 450 metres to be precise.
Thought I should possibly run an Ethernet cable or something?
I'm hoping wind companies have been overcharging poor farmers.. anyway, just trying to get a few quotes or some advice. Cheers, already looks expensive!

What sort of grant aid is available for this?
 

Exfarmer

Member
Location
Bury St Edmunds
Are you sure you want 60 amps per phase for that lot?
That would require a 240mm cable
If you mean 60 amp total that would require 70mm.
I cannot see a. Situation in the future where export is going to pay with renewables although storage " may" have a place. In this case I think it is very unwise to go for a big grossly underused cable
 
Ok, thanks all, obviously I'm not an electrician so advice is needed.
Still scratching my head a little,
The cable would supply my cattle yards primarily, I can also foresee some kind of electrical scheme coming back as diesel is replaced with electric vehicles, perhaps electric tractors will come in the future?
I'm told the national grid network will soon be updated to allow more farming businesses to add to it but who knows.
Just seemed a good idea to future proof myself for the cost of a few extra grand.
It was just my local sparky who thought I'd need 60 amp x 3 phase. (I've no idea)
Don't think the duct idea would work as can't see anybody threading anything through 450 metres? (Straight across a field)
Cheers for your help,
I'll let you know what my quote is when I get one!
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 105 40.9%
  • Up to 25%

    Votes: 93 36.2%
  • 25-50%

    Votes: 39 15.2%
  • 50-75%

    Votes: 5 1.9%
  • 75-100%

    Votes: 3 1.2%
  • 100% I’ve had enough of farming!

    Votes: 12 4.7%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 1,671
  • 32
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ

The Farming Forum has teamed up with the award winning hardware manufacturer Easy Compute to bring you an educational talk about how AI and blockchain technology is helping farmers to diversify their land.

Over the past 7 years, Easy Compute have been working with farmers, agricultural businesses, and renewable energy farms all across the UK to help turn leftover space into mini data centres. With...
Top