Ray996
Member
- Location
- North Scotland
Based up in far north of Scotland will,used to be chap in Aberdeen had lots of Ransome's spares and ploughs for sale .
Based up in far north of Scotland will,used to be chap in Aberdeen had lots of Ransome's spares and ploughs for sale .
There was someone advertising alot of plough spares on gumtree for a while up Aberdeenshire someplaceUsed to go under name of fordyman 20 on eBay,lost his number when I smashed last phone,stays up the lang stracht
Chap I was telling you about fordyman 20 is on eBay again @Mydexta ,two decent wee ploughs there alsoNo pics and plough dropped off and all covered up now unfortunatly
Chap I was telling you about fordyman 20 is on eBay again @Mydexta ,two decent wee ploughs there also
any link ?Chap I was telling you about fordyman 20 is on eBay again @Mydexta ,two decent wee ploughs there also
He has two ploughs on ebay at the moment, a TS59 with TCNs and a TS91. Fordyman 20any link ?
He has two ploughs on ebay at the moment, a TS59 with TCNs and a TS91. Fordyman 20
Says in item description they are not genuineFront mouldboard looks to be spurious and no Kristeel stamp on rear mouldboard.
Says in item description they are not genuine
Do you have any pics of your mod on your tcn frogs?will be attempting mod on my plough shortlyThere's the socket which bolts to the leg which u lock the bar point with, unbolt that, then look underneath and you will see at the tip of the body where the bar goes thru again.
It's the front socket which need to be removed as that's where the holes will be for the point when you drill them
I can't see how the one piece shares would be any different to fit, it's still the same process
Do you have any pics of your mod on your tcn frogs?will be attempting mod on my plough shortly
One piece shares i got from Westlake i was thinking of useingNo pics sorry, but it’s very very straight forward to do
Turn the frog upside down and place in a vice.
You will see the socket where the bar point goes at the tip of the frog.
This needs to be removed and ground as flush as possible as this is where the bolts for the new points will come thru.
After that’s done, turn the frog over and offer up the point, mark the holes and drill, same for the share.
One piece shares i got from Westlake i was thinking of useing