You are both so right. Biomass plumbing is a lot more specialised than most folk think. I think due to the explosion of the RHI ever one with a tool box jumped in and made some big cock ups putting the end user in the Poo.
Some of the mistakes I have seen are daft - pipe leaves boiler in 3" and the first thing they do is step it down by half! Client then complains boiler is not performing.
Suppose it's like this in every industry, what can be done to stop it though?
Well I thought that what the regulatory bodies were there for.