- Location
- Huntingdon, UK
Bags of gravel , bags are £3 each and fill them with gravel with mini digger and bags on pallet tines and add them as the concrete comes up to save putting to much weight on packers holding pit at correct level concrete half one day and take the bags out next day and slash them into pan mixer to top up the back fill the following day never had a problem like this as we have always mixed on site to allow time to poker concrete in rather than have a wagon waiting it usually takes two men a day to dig out install and half backfill with concrete mixed on site
Good idea.