- Location
- Warwickshire
What would a steel portal frame building- say 100’ x 50’ cost today ?
Erected, gable ends clad and gutters fitted
Concrete floor extra.
Thanks
Erected, gable ends clad and gutters fitted
Concrete floor extra.
Thanks
£50-60k ishWhat would a steel portal frame building- say 100’ x 50’ cost today ?
Erected, gable ends clad and gutters fitted
Concrete floor extra.
Thanks
Built shed same spec but 20ft longer two and half years ago . Minus doors it was 36k!!!This was a quote I had in April. Take out the door price and you are looking at £64K
Length: 30m (98' 5")
Width: 15m (49' 2")
Eaves Height: 4.500m (14' 9")
Roof Pitch: 15°
Bay Size: All bays are the same size at 6m, end bays reduced to achieve overall length.
Project Costs
Supply: £50,328.22
Delivery: £551.15
Doors: £13,665.60
Erection: £10,419.33
Foundations: £2,800.00
Total Project Price: £77,764.30
Same thing built here in 2007, with a 45ft central partition cost £50k.24m x 19m, 6m to the eaves, panels to 3m, 6m roller door. Circa 90K.
What the hell are the doors?This was a quote I had in April. Take out the door price and you are looking at £64K
Length: 30m (98' 5")
Width: 15m (49' 2")
Eaves Height: 4.500m (14' 9")
Roof Pitch: 15°
Bay Size: All bays are the same size at 6m, end bays reduced to achieve overall length.
Project Costs
Supply: £50,328.22
Delivery: £551.15
Doors: £13,665.60
Erection: £10,419.33
Foundations: £2,800.00
Total Project Price: £77,764.30
They should be able to commit to a price ,When the quote is accepted if orders are placed with suppliers they should hold prices ,Concrete panels , zed purlins, roof sheeting ,steel and cladding been delivered here weekly with prices fixed as far back as JanuaryNo one will commit to prices as commodities price going up all the time possibly
Where from?you can get 100x50x21 straw shed supply only 28k
Who's that from?you can get 100x50x21 straw shed supply only 28k
Someone advertising in guardianWho's that from?
Put 100 x 50 up yourself start to finish in a weekSave tens of thousands shopping around and employing local erectors etc just like housebuilding. If your employing big companies with offices full of office staff etc expect it to cost tens of thousands more.
Save tens of thousands shopping around and employing local erectors etc just like housebuilding. If your employing big companies with offices full of office staff etc expect it to cost tens of thousands more.