Forever Fendt
Member
- Location
- Derbyshire
saw cut the slab inline with main columns to 25% of slab thickness for a controlled crack about 24 hours after layingCuts allow the slab to break at a that point , as it sets , instead it could crack all over the place , generally cuts are put in every 3/4m about 3/4 s the depth off the slab