multi power
Member
- Location
- pembrokeshire
They both would probably be more useful that wayI'll swap you can have my dad,I don't want him back..........
They both would probably be more useful that wayI'll swap you can have my dad,I don't want him back..........
Obviously holiday time in the precast industry,no quotes yet.
Wally will soon have it in for you now he knows what to charge ....£51,966.00
If you shutter it do you have to keep the slurry away from the girders to stop them corroding?
only ever shuttered with girders before,looks like you put the floor in first then raw bolt down some stays to hold the boards up,what thickness of wall would you have and would you put steel in? just on putting a precast channel in now,abit smaller than the one you had a quote for,think it works out around 100pound a foot for 6 feet wide
What thickness lid would you need over a 12' wide tank to take heavy traffic?
@eulb have you gone ahead with the project?
No had a change of plan,going to have a narrow open channel at the end of the building,that way I won't have any slats.