dannewhouse
Member
- Location
- huddersfield
Slurry store is full, the reception pit is filling and we're 90% a lot is out the store.
Don't want to disturb the sluces if it's some solid muck holding back an avalanche but any ideas what to do?
Pipe about ft diameter and 2 sluce underground.
Ideally we want to umbilical half the store this week and leave rest till after 1st cut.
Don't want to open sluce to spread from reception pit and not be able to stop it!!!
Don't want to disturb the sluces if it's some solid muck holding back an avalanche but any ideas what to do?
Pipe about ft diameter and 2 sluce underground.
Ideally we want to umbilical half the store this week and leave rest till after 1st cut.
Don't want to open sluce to spread from reception pit and not be able to stop it!!!