Have mig welded them in the past to keep us going and we have never had one brake in the same place just V it out well then flap disk it back nice the smooth on the front side.
 

Treemover

Member
Location
Offaly
I welded up one years back, my welding wouldn’t be the best; but as the board was still good; I thought I’d test my welding; it held for as long as we had it.
 

MrNoo

Member
Arable Farmer
Location
Cirencester
Don't overthink this, just weld it.
This!!!!
I have Mig'd them, Tig'd them with steel/stainless filler rods and all been fine. All my match plough stuff I use stainless steel filler rod and TIG if I need to weld for whatever reason.
A very talented old school spaceframe chassis builder (French) told me all their steel chassis were welded using stainless filler wire and TIG, which I couldnt get my head around at the time but for some reason it just works, he used to build chassis for Henri Pescarolo
 

yellowbelly

Member
Livestock Farmer
Location
N.Lincs
Looking for advice I've got a crack on a dowdeswell board what do I need to consider when welding it.?
Do it in stages weld it all up at once it will overheat and crack or warp.
If you're worried about it warping bolt it to another one. V out the side you can see, weld it up, let it cool, then bolt it to the back of the good one and repeat for the other side.
 

Bury the Trash

Member
Mixed Farmer
The main reasons they break are wear ,ie worn thin or catching a heavy bit of ground to turn like a a hard piece of clay on the headland or because of a poorly adjusted or non exsistant stay .

If the mouldboard has worn thin the rear lower edge will be receding anyway and be affecting the ploughing negatively so replace the board and make sure your stays are all set nicely.

A new genuine ycn board won't cost anymore than another foreign plough genuine mouldboard more expensive than ucn though of course.
 
Last edited:

Wisconsonian

Member
Trade
This!!!!
I have Mig'd them, Tig'd them with steel/stainless filler rods and all been fine. All my match plough stuff I use stainless steel filler rod and TIG if I need to weld for whatever reason.
A very talented old school spaceframe chassis builder (French) told me all their steel chassis were welded using stainless filler wire and TIG, which I couldnt get my head around at the time but for some reason it just works, he used to build chassis for Henri Pescarolo
The usual reason for using SS filler rod is for higher carbon alloy steels to suck a little carbon out of the steel next to the weld to lessen the brittleness and cracking. Works OK for cast iron too.
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 107 39.9%
  • Up to 25%

    Votes: 98 36.6%
  • 25-50%

    Votes: 40 14.9%
  • 50-75%

    Votes: 5 1.9%
  • 75-100%

    Votes: 4 1.5%
  • 100% I’ve had enough of farming!

    Votes: 14 5.2%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 2,670
  • 49
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ

The Farming Forum has teamed up with the award winning hardware manufacturer Easy Compute to bring you an educational talk about how AI and blockchain technology is helping farmers to diversify their land.

Over the past 7 years, Easy Compute have been working with farmers, agricultural businesses, and renewable energy farms all across the UK to help turn leftover space into mini data centres. With...
Top