Domestic wind turbines

Quite simple, if you have 1 cubic foot per second and a vertical drop of 20 feet, then you have the potential to produce 1kw.

20feet/6m is a fair old drop to create/have though. You do definitely need a drop then? no point sticking a water turbine type thing in a little stream on a fairly gradual gradient?
 

Y Fan Wen

Member
Location
N W Snowdonia
20feet/6m is a fair old drop to create/have though. You do definitely need a drop then? no point sticking a water turbine type thing in a little stream on a fairly gradual gradient?
It's all to do with the ratio. 2cuft/sec over 10 feet would be the same. So, big river, less drop. Small river big drop. In my own case 1 cuft and 200 feet actually gives 12kw. That's because it isn't actually 20 feet, I think it is 16 or 17 so I get an extra 2kw over 200'.
If I was redoing my site from new I would probably go for about 20kw as the river flow is actually a bit more than our estimate 40 years ago.
The present 8 inch pipe limits the output to 15kw so if the present genny dies (13kw) I would replace it with a 17kw one. The extra kw is so it wouldn't be running at 100% when flat out. I would have to use a 10 inch pipe for 20kw.
 

Badshot

Member
Location
Kent
There used to be weirs all along the river adult until they took them out, I guess they'd have been handy for a water turbine.
EA could be generating a sh!t load of electric with the rivers they control.
 

j6891

Member
Location
Perth & Kinross
Used to have an old mill pond and mill wheel here. Have thought about laying a new pipe/turbine as plenty water in winter when supply is needed. Any recommendations for installers etc?? Scotland based ideally
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 105 40.5%
  • Up to 25%

    Votes: 94 36.3%
  • 25-50%

    Votes: 39 15.1%
  • 50-75%

    Votes: 5 1.9%
  • 75-100%

    Votes: 3 1.2%
  • 100% I’ve had enough of farming!

    Votes: 13 5.0%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 1,799
  • 32
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ

The Farming Forum has teamed up with the award winning hardware manufacturer Easy Compute to bring you an educational talk about how AI and blockchain technology is helping farmers to diversify their land.

Over the past 7 years, Easy Compute have been working with farmers, agricultural businesses, and renewable energy farms all across the UK to help turn leftover space into mini data centres. With...
Top