Planning Applications, PD and the like (General Chat)

BAC

Member
We have an old pole barn which is roughly 13 x 45. Want to take it down and put a 20 x 50 storage shed up with workshop. There is planning currently already on a residential property close by. By applying for planning permission for a new shed, would it affect the original planning on the residential building?

Also, how easy is it for planning to be passed if there is already a building there? Does this make it easier??
 

Kidds

Member
Horticulture
We have an old pole barn which is roughly 13 x 45. Want to take it down and put a 20 x 50 storage shed up with workshop. There is planning currently already on a residential property close by. By applying for planning permission for a new shed, would it affect the original planning on the residential building?

Also, how easy is it for planning to be passed if there is already a building there? Does this make it easier??
Besides the planning aspect have you spoken to an accountant about repairing the old shed rather than building a new one re tax?
 
We have an old pole barn which is roughly 13 x 45. Want to take it down and put a 20 x 50 storage shed up with workshop. There is planning currently already on a residential property close by. By applying for planning permission for a new shed, would it affect the original planning on the residential building?

Also, how easy is it for planning to be passed if there is already a building there? Does this make it easier??
If planning has been approved on the house then applying planning for the barn can't affect it.

Replacing a building will always be looked on more favourably than building in a virgin site but it doesn't mean planning is a formality.
 

BAC

Member
If planning has been approved on the house then applying planning for the barn can't affect it.

Replacing a building will always be looked on more favourably than building in a virgin site but it doesn't mean planning is a formality.

That is the main worry. The architect for the house has told us to refrain from applying for planning until the house is complete but I don’t have that much time to wait, he hasn’t been the best architect so far anyway!

Do I need to apply for limited development as the farm is less than 12 acres
 
That is the main worry. The architect for the house has told us to refrain from applying for planning until the house is complete but I don’t have that much time to wait, he hasn’t been the best architect so far anyway!

Do I need to apply for limited development as the farm is less than 12 acres
Your architect seems a bit of a worry! Has planning for the house been granted?
You'll probably need full planning as you are under 4Ha
 

BAC

Member
Your architect seems a bit of a worry! Has planning for the house been granted?
You'll probably need full planning as you are under 4Ha

Yes, House is being refurbished but part of it collapsed and is being rebuilt and this is what is worrying him.

We are 4.5 hectare. Does that make any difference??
 
Yes, House is being refurbished but part of it collapsed and is being rebuilt and this is what is worrying him.

We are 4.5 hectare. Does that make any difference??
4Ha is the threshold for Agricultural Permitted Development so you could be ok.

If planning is complete for the house then crack on with the barn.

PM me or email me ([email protected]) if you want any more specific information.
 
There was an article in I think the NFU mag from Acorus about LPA authorities and their 5 year housing availability plan.
I had a look at my LPA plan and their availability stands at 3.3 years supply for the 5 years so as they admitt, quite a shortfall.
I have a 70 acre block of land that runs to within the village on one boundary and about 300m on another boundary.
On the boundary that runs to within 300m of the village there is a single bungalow on the opposite side of the road.
I have permission for a generator in a container and PD (under 465m square) for a shed on the land but away from the village and wondered whether I could get a few high value plots near the village.
There is no other development at or around the village and I should add that anything I attempt to do will be resisted as I am not well liked.
Anyone got a cunning plan?
 

Kidds

Member
Horticulture
There was an article in I think the NFU mag from Acorus about LPA authorities and their 5 year housing availability plan.
I had a look at my LPA plan and their availability stands at 3.3 years supply for the 5 years so as they admitt, quite a shortfall.
I have a 70 acre block of land that runs to within the village on one boundary and about 300m on another boundary.
On the boundary that runs to within 300m of the village there is a single bungalow on the opposite side of the road.
I have permission for a generator in a container and PD (under 465m square) for a shed on the land but away from the village and wondered whether I could get a few high value plots near the village.
There is no other development at or around the village and I should add that anything I attempt to do will be resisted as I am not well liked.
Anyone got a cunning plan?
What does the neighbourhood plan say? If it basically says "No development on Wasted Year's land" you are stuck, if it says no development anywhere than you have a chance.
Of course as soon as you submit anything they will change the neighbourhood plan to suit.
 
There was an article in I think the NFU mag from Acorus about LPA authorities and their 5 year housing availability plan.
I had a look at my LPA plan and their availability stands at 3.3 years supply for the 5 years so as they admitt, quite a shortfall.
I have a 70 acre block of land that runs to within the village on one boundary and about 300m on another boundary.
On the boundary that runs to within 300m of the village there is a single bungalow on the opposite side of the road.
I have permission for a generator in a container and PD (under 465m square) for a shed on the land but away from the village and wondered whether I could get a few high value plots near the village.
There is no other development at or around the village and I should add that anything I attempt to do will be resisted as I am not well liked.
Anyone got a cunning plan?
I would consider doing a pre-app with the council, they are confidential so none of the NIMBY's will find out and at the end of it you will have a good idea whether you have a chance and whether pissing off the locals will be worth it.
 
I would consider doing a pre-app with the council, they are confidential so none of the NIMBY's will find out and at the end of it you will have a good idea whether you have a chance and whether pissing off the locals will be worth it.
That is interesting, I didn't know about pre-apps.
The locals are already pee'd off (I'm local as well BTW).
Is a pre -app different from paying for a site visit?
 
That is interesting, I didn't know about pre-apps.
The locals are already pee'd off (I'm local as well BTW).
Is a pre -app different from paying for a site visit?
There are usually two types of pre-app, a written desktop response and and site visit followed by a written response. Either way you will get an idea what the council will and won't allow in principle.
 

franklin

New Member
It always helps to have / have someone do some digging. Has the authority built enough already? Has it enough allocated land that is coming up to build on? Have they done a survey to identify the need for affordable housing etc? A local agent will tell you how they are doing as planning rules change so quickly - at one point they were so behind here that they would consider any reasonable scheme within the town / village envelope.
 

Forever Fendt

Member
Location
Derbyshire
I would consider doing a pre-app with the council, they are confidential so none of the NIMBY's will find out and at the end of it you will have a good idea whether you have a chance and whether pissing off the locals will be worth it.
Would a pre app stand for much if @wasted years application went to committee or would it be delt with under delegated powers as the committee does not always follow the officers recommendations,Is there anyway you can add some community benefit into the scheme that may get locals a little more on side
 
Would a pre app stand for much if @wasted years application went to committee or would it be delt with under delegated powers as the committee does not always follow the officers recommendations,Is there anyway you can add some community benefit into the scheme that may get locals a little more on side
A pre-app is an informal, non-binding response from the council and therefore should not be taken as gospel but would provide greater insight into the issues that would need to be highlighted in the full application.
 

Forever Fendt

Member
Location
Derbyshire
A pre-app is an informal, non-binding response from the council and therefore should not be taken as gospel but would provide greater insight into the issues that would need to be highlighted in the full application.
I think i can help him out here for free as i am quite sure i know the councils response,Perhaps a good planning consultant would be the order of the day
 
I think i can help him out here for free as i am quite sure i know the councils response,Perhaps a good planning consultant would be the order of the day
I don't know any of those I'm afraid; will I do lol!

I think the councils view will be swayed if the land is adjoining the existing Limits of Build Development (LBD), if their housing demand is still below the acceptable level, if they do not have any allocated sites available to service that need and if what you can get on the site will make a large enough dent in their need.
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 105 40.5%
  • Up to 25%

    Votes: 94 36.3%
  • 25-50%

    Votes: 39 15.1%
  • 50-75%

    Votes: 5 1.9%
  • 75-100%

    Votes: 3 1.2%
  • 100% I’ve had enough of farming!

    Votes: 13 5.0%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 1,802
  • 32
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ

The Farming Forum has teamed up with the award winning hardware manufacturer Easy Compute to bring you an educational talk about how AI and blockchain technology is helping farmers to diversify their land.

Over the past 7 years, Easy Compute have been working with farmers, agricultural businesses, and renewable energy farms all across the UK to help turn leftover space into mini data centres. With...
Top