So after 2 yrs after starting to think about building our new home and trying 4 sites I finally got to start levelling our site out this week.

The hole is 22m long x 12m wide

That's as much as I can get done just now I'll need to get back to farm work till the builder hopefully comes in April to get the founds in
 

Attachments

  • 20210217_103032.jpg
    20210217_103032.jpg
    559.9 KB · Views: 0
  • 20210219_162951.jpg
    20210219_162951.jpg
    575 KB · Views: 0
  • 20210219_162917.jpg
    20210219_162917.jpg
    384 KB · Views: 0
  • 20210220_162429.jpg
    20210220_162429.jpg
    598 KB · Views: 0
  • 20210220_162018.jpg
    20210220_162018.jpg
    550.9 KB · Views: 0
  • 20210220_162044.jpg
    20210220_162044.jpg
    618.6 KB · Views: 0

KB6930

Member
Location
Borders
So after doing nowt for a few weeks the builder wanted to get started 2 weeks early after being held up on another job so I wasn't going to say no .

2 weeks later we're getting there. Picking up the timber frame tomorrow but it'll be mid may before it's going up .
 

Attachments

  • 20210425_200846.jpg
    20210425_200846.jpg
    523.6 KB · Views: 0

KB6930

Member
Location
Borders
Looking good! Nice to see a different sort of build. 👍

Please keep us posted. 🙂
It's a fairly typical build for these parts we've got a timber frame company in town.

It's been a heap of hassle so far I'm still at the stage of wishing I'd never started :banghead: !!!
 

Steevo

Member
Location
Gloucestershire
It's a fairly typical build for these parts we've got a timber frame company in town.

It's been a heap of hassle so far I'm still at the stage of wishing I'd never started :banghead: !!!

Much as I love a good shed build thread on here, a house is a welcome shake up. Is the timber frame pre-insulated?

No building project goes with a hitch or two that’s for sure....wishing you the best of luck and speedy progress from now on. Right time of year weatherwise to be building at least.
 

KB6930

Member
Location
Borders
Yeah the insulation is in the frame already.

We're desperate for rain but I've been quite happy with dry dusty conditions on site for work to get done
 

PSQ

Member
Arable Farmer
So after doing nowt for a few weeks the builder wanted to get started 2 weeks early after being held up on another job so I wasn't going to say no .

2 weeks later we're getting there. Picking up the timber frame tomorrow but it'll be mid may before it's going up .

I spy with my little eye, the old golf factory?
Wee Stevie, or Panda?
 

KB6930

Member
Location
Borders
I spy with my little eye, the old golf factory?
Wee Stevie, or Panda?
Might've been before my time? It's always been the engineers in there as far back as I remember.

Neither 2 brother's from chirnside they're bloody grafters they just get on with it when they're here
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 102 41.5%
  • Up to 25%

    Votes: 90 36.6%
  • 25-50%

    Votes: 36 14.6%
  • 50-75%

    Votes: 5 2.0%
  • 75-100%

    Votes: 3 1.2%
  • 100% I’ve had enough of farming!

    Votes: 10 4.1%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 680
  • 2
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ

The Farming Forum has teamed up with the award winning hardware manufacturer Easy Crypto Hunter and Easy Compute to bring you an educational talk about how AI and blockchain technology is helping farmers to diversify their land.

Over the past 7 years, Easy Crypto Hunter have been working with farmers, agricultural businesses, and renewable energy farms all across the UK to help turn leftover space into...
Top