Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
You would better with the bracket more forward picking up on the bellhousing bolts as the plastic fuel tank is not very strong , to put any weight on, we had one crack with just tools box sitting on top of it
Need to move the pipes of the 64 onto the 7726.
Anyone put them on a 77 series MF ?
If so any chance of a picture please?
Not sure the 3mm plate will be strong enough
I’ll get a pic of my set up tomorrow. Basically we got a new plate made for the top with a stay down to the step, similar to what you have on the 6499. Then bolt the base of the pipe bracket to the plate.
Need to move the pipes of the 64 onto the 7726.
Anyone put them on a 77 series MF ?
If so any chance of a picture please?
Not sure the 3mm plate will be strong enough
Weavings did the 6499, did ring and ask them for guidance, did have a chuckle when the chap said they hadn’t done any MF’s for a long time, I then reminded him of mineI’ll get a pic of my set up tomorrow. Basically we got a new plate made for the top with a stay down to the step, similar to what you have on the 6499. Then bolt the base of the pipe bracket to the plate.
Weavings did the 6499, did ring and ask them for guidance, did have a chuckle when the chap said they hadn’t done any MF’s for a long time, I then reminded him of mine
Thank youThis is what our local blacksmith knocked up. He does a lot of side pipes for one passes and said fergies are some of the worse to fit to.
Apart from the fancy metalwork you have.
There's very little weight involved in two lengths of downpipe.
The seed inside is flying, so zero added weight.
Now that's a Rig very smartIt's on the tool box now but was bolted where the plate is
Why did you send the original mf to weaving? You seem to of done a good job attaching the pipe to the 2nd. Did they add anything thing else?
Pipe update, added another 2 fixing points between the existing
Then created the mounting plate, 10mm flat plate supported by 2 x 30mm box 5mm wall with 2 x 50mm box 5mm wall on top to mount the adjustable pipe bracket
Even managed to paint it
Just the electrics to finish tomorrow and hook the Sabre part up on the back.
They offered to collect, fit and return foc, so seemed a no brainer.Why did you send the original mf to weaving? You seem to of done a good job attaching the pipe to the 2nd. Did they add anything thing else?
Oh I see, that makes sense.They offered to collect, fit and return foc, so seemed a no brainer.
In hindsight it proved to be very expensive
Love the drill. What do you sow with it?It's on the tool box now but was bolted where the plate is