What silage clamps have people built recently.

DairyGrazing

Member
Mixed Farmer
Location
North West
What silage clamps have people built recently. Don't want to do posts and panels as I have a couple and can't stand putting the side sheets up on them.

Wonder if I could just do a concrete pad and use L shape panels for the walls maybe 6ft or 8ft high?
 

O'Reilly

Member
IMG_20240210_125641.jpg
 

O'Reilly

Member
The feet are a nuisance, as you see, I've given up shearing the last bit, and just lightly grab it and pull away. There's a bit of forking to get the last bit off the feet, and the same when filling to get the sheet settled carefully with no rucks or folds under the grass. Use an old top sheet folded in two on the sides, then if the sheet moves as the silage is rolled down, it doesn't tear on the concrete. Don't know if rocket walls would be better.
 

Wesley

Member
We need some more clamps to make life easier. Think will just be a big concrete pad with a course of concrete blocks (second hand if I can round enough up) around the outside to keep the EA happy & stop effluent escaping. Then hopefully in a couple years try & get a grant to cover & then pour the walls. Can’t see how moveable panels will be any different to what you’ve currently got. Probably worse.
 

Serup

Member
Mixed Farmer
Location
Denmark
I made an extension to my storage in 22.
The older ones are all concrete, the first ones with side element as part of the construction, the next one with free standing element and concrete floor. The last one is with free standing elements and asfalt on the floor.
This is fast to make and hopefully will last. Asfalt should handle effluents better but time will tell.
The last one is 24x50 meters with 3 meter sides and 1,5m end. It’s the first one with end wall, which i now whish i had in all of them.
It’s really an upgrade not to have some of the silage in a pile on clay anymore
IMG_2655.jpeg
IMG_2731.jpeg
IMG_2762.jpeg
IMG_5707.jpeg
IMG_5731.jpeg
 
We need some more clamps to make life easier. Think will just be a big concrete pad with a course of concrete blocks (second hand if I can round enough up) around the outside to keep the EA happy & stop effluent escaping. Then hopefully in a couple years try & get a grant to cover & then pour the walls. Can’t see how moveable panels will be any different to what you’ve currently got. Probably worse.

I got a capital only mid tier grant to cover two pits that don't yet exist.
 

Wesley

Member
I got a capital only mid tier grant to cover two pits that don't yet exist.
I’m guessing a lot comes down to what CSFO you’ve got covering your area? An agent we deal with says there’s a big difference in what they’ll approve.
I’ve heard of similar before & I’m tempted to ask the question about covering a feed yard that doesn’t exist yet.
 
I’m guessing a lot comes down to what CSFO you’ve got covering your area? An agent we deal with says there’s a big difference in what they’ll approve.
I’ve heard of similar before & I’m tempted to ask the question about covering a feed yard that doesn’t exist yet.

There just throwing money everywhere at the moment. I used an agent and somehow he got me a lot more than my CSFO offered.
 

Farmer Keith

Member
Location
North Cumbria
IMG_1532.jpeg
IMG_1475.jpeg
IMG_1402.jpeg
IMG_1393.jpeg

We’re in the process of doing this, replacing an earth banked clamp that failed an EA inspection on the same site, I see your point about the side sheets, we filled half of it last year as there was power lines over half of the site waiting to be moved, earth banks were a doddle to sheet in comparison, I can’t see the L panels being that much better though unless you back fill them which is a hassle with EA rules.

It’s going to be a tidy job buts it’s been not that economical, CS grants going to cover 30-40% of it when it’s finished without that you not even of entertained the idea.
 

Jaffa Cakes

Member
Livestock Farmer
Location
NI
View attachment 1163719View attachment 1163720View attachment 1163721View attachment 1163722
We’re in the process of doing this, replacing an earth banked clamp that failed an EA inspection on the same site, I see your point about the side sheets, we filled half of it last year as there was power lines over half of the site waiting to be moved, earth banks were a doddle to sheet in comparison, I can’t see the L panels being that much better though unless you back fill them which is a hassle with EA rules.

It’s going to be a tidy job buts it’s been not that economical, CS grants going to cover 30-40% of it when it’s finished without that you not even of entertained the idea.
Why so high?
 
Location
West Wales
It really is depressing, trying to adhere to regulations, with a volatile and currently unimpressive milk price.
It’s impossible frankly. Concrete has doubled since we budgeted our shed and silage clamps projevt. Builders dragged their heels and then covid mean were fighting an up hill battle to get things finished on poorer returns than ever.
 

SFI - What % were you taking out of production?

  • 0 %

    Votes: 105 40.5%
  • Up to 25%

    Votes: 94 36.3%
  • 25-50%

    Votes: 39 15.1%
  • 50-75%

    Votes: 5 1.9%
  • 75-100%

    Votes: 3 1.2%
  • 100% I’ve had enough of farming!

    Votes: 13 5.0%

May Event: The most profitable farm diversification strategy 2024 - Mobile Data Centres

  • 1,739
  • 32
With just a internet connection and a plug socket you too can join over 70 farms currently earning up to £1.27 ppkw ~ 201% ROI

Register Here: https://www.eventbrite.com/e/the-mo...2024-mobile-data-centres-tickets-871045770347

Tuesday, May 21 · 10am - 2pm GMT+1

Location: Village Hotel Bury, Rochdale Road, Bury, BL9 7BQ

The Farming Forum has teamed up with the award winning hardware manufacturer Easy Compute to bring you an educational talk about how AI and blockchain technology is helping farmers to diversify their land.

Over the past 7 years, Easy Compute have been working with farmers, agricultural businesses, and renewable energy farms all across the UK to help turn leftover space into mini data centres. With...
Top