- Location
- South lakes
A lot of material are going up 17.5%. some even more from the 1st Jan, blocks are a 4 week back order, glass is hit n miss, insulation has come down a bit but ni on doubled since covid, which ever way you go it will be a lot more expensive, but without seeing your starting point difficult for people to say, old = character + hidden work, new = better insulated, always going forward 90% of the time, but costly to put character in,